Projects

Karratha Gold and Copper – Pilbara Craton, WA

Artemis Resources Ltd.
  • Status: Advanced Exploration
  • Commodities: Au, Cu
  • Deposit Types: Shear-hosted

APEX has worked with Artemis Resources (“Artemis”) across multiple exploration programs across Western Australia since 2024. APEX has supported exploration activities at a variety of levels, ranging from complete drill program management and supervision through to providing experienced geological and field personnel to assist ongoing regional exploration campaigns. Remote conditions, high temperatures, and challenging terrain required careful planning and execution, with all programs completed safely and to a high operational standard.

The Karratha Gold and Copper Project are located approximately 25 km from the regional city of Karratha and covers approximately 237km² of tenure. APEX has provided comprehensive geological field services for the project, including drill program management, drilling supervision, and geological logging.

APEX geologists completed 30 RC drill holes for a total of 408m at the Europa Prospect, and a further 5 RC drill holes for 1,428m at the Lulu Prospect in 2024, targeting gold and copper mineralisation. During 2025, 18 RC holes were drilled and supervised. In early 2026, APEX also supervised, logged, and sampled a diamond drill program at the Titan East Prospect within the Karratha Gold–Copper Project. Results from the program confirmed the down-dip continuity of structurally controlled mineralisation, with significant intersections identified along strike. APEX’s continuous support has confirmed a new shear-hosted gold system with high grade results of 5m @ 13.1g/t Au identifying the north-east trending shear zone. Follow-up drilling on confirmation of continuity on an existing mineralised trend with 19m @ 1.6 g/t Au