- Status: Development
- Commodities: Au, Ag
- Deposit Types: Hydrothermal
Project Scope
APEX has worked with MEGA Resources (“MEGA”) on multiple projects across Western Australia since 2024. APEX has been involved at various levels across both exploration and ongoing resource development activities. Services have included the provision of additional support staff for regional exploration programs and mine sites, drill program support, and geological data compilation. High temperatures and rugged terrain presented considerable operational challenges; however, all drill programs and field activities were completed safely and to a high standard across all projects, APEX has delivered comprehensive geological data compilation & validation, incorporating both recent and historical datasets. This has included the implementation of WAMEX data integration to maintain data integrity and support the generation of exploration and resource targets.
The Mt Dimer Taipan Gold & Silver Project is located approximately 120km north-east of Southern Cross in Western Australia’s Eastern Goldfields and hosts a JORC Inferred Mineral Resource of approximately 722,000tounce at 2.10 g/t Au for 48,545 ounces of gold, alongside 3.84 g/t silver for ~89,000 ounces of silver. APEX has provided geological field services including geotechnical grade-control drilling supervision, geological logging, sampling, and broader exploration program support. RC drilling at the Taipan Project has highlighted the potential for extensions to existing mineralisation, high-grade intercepts such as 6m @ 10.2 g/t Au, 3 m @ 4.8 g/t Au, and 4m @ 4.5 g/t Au, demonstrating the presence of continuous high-grade zones within and adjacent to the existing resource envelope. These results supported a transition toward development, with mining commencing late 2025 under a Right to Mine agreement. APEX geologists have assisted MEGA with open-pit production including pit wall mapping and day to day supervision of mining activity.